Skip to Main Content

Local elections 2026

The count for yesterday's (Thursday) local elections in Rugby starts later this morning, with the first results expected to be declared from 2pm onwards.

We will post regular updates at www.rugby.gov.uk/results once the first result has been declared.

  • All council services
  • Cost of living help
  • Town centre regeneration
  • Rugby Net Zero
Log in to my account
Logo Image

Local elections 2026

The count for yesterday's (Thursday) local elections in Rugby starts later this morning, with the first results expected to be declared from 2pm onwards.

We will post regular updates at www.rugby.gov.uk/results once the first result has been declared.

  1. Home
  2. Planning
  3. Development strategy
  4. Warwickshire, Coventry and Solihull Green Infrastructure Strategy

Warwickshire, Coventry and Solihull Green Infrastructure Strategy

  1. Warwickshire, Coventry and Solihull Green Infrastructure Strategy
    • Document format: pdf
    • Document size: 2.21MB
    • Download Warwickshire, Coventry and Solihull Green Infrastructure Strategy
  2. Annexe A - Biodiversity Offsetting
    • Document format: pdf
    • Document size: 1.23MB
    • Download Annexe A - Biodiversity Offsetting
  3. Annexe B - Green Infrastructure Guide
    • Document format: pdf
    • Document size: 0.82MB
    • Download Annexe B - Green Infrastructure Guide
  4. Habitat Target Costings to 2026
    • Document format: pdf
    • Document size: 0.51MB
    • Download Habitat Target Costings to 2026

Share this page

  • Home
  • Site map
  • Accessibility
  • Contact us
  • Privacy and cookies
  • Disruption and emergencies
  • Translation
Follow us:
  • Facebook
  • YouTube
  • Instagram
Logo Image

Copyright © 2026 Rugby Borough Council